Buying coal for a power plant means balancing four things: the right quality for the boiler, the lowest cost per unit of energy, secure supply and clean contract terms. Get the quality wrong and efficiency drops and maintenance rises. Get the supply wrong and the plant may run short when it matters most.

This checklist covers what to look at before you sign.

Haul trucks and loading machinery working among coal stockpiles at a mine
Power plant coal is bought on specification, with every cargo tested.

1. Quality that fits the boiler

FactorWhy it matters
Calorific value (with basis)Decides how much coal you burn per MWh
Total moistureLowers boiler efficiency and adds freight weight
AshWear, slagging, ash handling and disposal costs
SulphurSO2 emissions and corrosion
Volatile matterIgnition and flame stability
HGIMill capacity and fineness
Ash fusion temperatureSlagging and fouling risk
Size and finesHandling, dust and feeding
Start from the boiler’s design coal range and stay inside it.

See coal grades explained and how to assess coal quality.

2. Cost per unit of energy

Compare offers on delivered price ÷ net calorific value. Include freight, port charges, handling, ash disposal and the efficiency impact of the coal. The cheapest tonne is not always the cheapest megawatt-hour.

3. Emission limits

Check sulphur, ash and, if relevant, chlorine and mercury against your permit. Lower-sulphur coal can reduce scrubber costs or make compliance possible without one. See low-sulphur coal.

4. Supply security

  • Is the origin stable, or exposed to policy changes, weather and logistics problems?
  • Can the supplier deliver the full annual volume on schedule?
  • Do you have a qualified second source?

In 2026 the IEA expects Indonesian exports to fall to about 495 Mt, and Colombia’s Cerrejón mine declared force majeure on 1 June. See how to secure a reliable coal supply chain.

5. Price index and contract terms

  • Agree the index: ICI for Indonesian coal, Newcastle for Australian, Richards Bay for South African
  • Set the adjustment formula for actual calorific value
  • Define rejection limits, demurrage, laytime and force majeure

See Indonesian coal price.

6. Delivery terms and logistics

Decide between FOB and CFR or CIF, and check your port’s draft, unloading rate and storage. Vessel size and loading method affect the delivered price.

7. Independent inspection

Require sampling and analysis by an independent inspector at loading, and agree which result is final if you also test on arrival.

8. A credible counterparty

Work with suppliers who can name the mine and loading port, accept inspection and use secure payment such as a letter of credit. Avoid offers that cannot be traced or that ask for upfront fees.

Buying Indonesian coal through Agromer

Agromer holds mandates for Indonesian thermal coal for power plants and industrial buyers. We work with an end-buyer LOI, payment by 100% DLC or SBLC, and SGS inspection at loading. Send us your boiler’s coal range, monthly quantity, contract length and discharge port. See coal suppliers for power plants and our Indonesian coal supply page.

Before you send: Agromer trades with businesses only, in bulk shipments. We do not supply retail or small farm quantities. Payment is by irrevocable documentary letter of credit (DLC) or SBLC. For urea, coal and petroleum products, an end-buyer Letter of Intent is needed before an offer is issued.
Your requirement
Your details

Fields marked * are required. Quotations depend on product availability, specifications, destination and market conditions at the time of the offer.

Frequently asked questions

What is the most important factor when buying coal for power?

Matching the coal to the boiler’s design range, then comparing offers on delivered cost per unit of energy.

What calorific value do power plants need?

It depends on the boiler. Many Asian plants burn Indonesian coal between about 3,800 and 5,500 kcal/kg GAR; others are designed for 6,000 kcal/kg coal.

Why does moisture matter?

Moisture lowers the useful energy, reduces boiler efficiency and increases freight cost per unit of energy.

Which price index should a coal contract use?

Usually the index for the origin: ICI for Indonesia, Newcastle for Australia or Richards Bay for South Africa.

How can a plant reduce supply risk?

By qualifying a second source, using term contracts, holding adequate stock and inspecting every cargo.

What payment terms are common?

Documentary letters of credit, with payment against shipping and inspection documents.